ABCA Systems Maintenance Case Study

Maintenance Case Study

ABCA Systems were appointed in 2009 by a competitive tender through the fusion 21 Frame work, to undertake the reactive maintenance of the door entry systems to over 300 Blocks of flats, covering 4000 properties with door entry and access control for First Choice Homes Oldham.

On award of the contract, we immediately appointed 2 dedicated engineers and completed a full stock condition survey free of charge, to establish exactly what equipment was installed across the borough.

Over time, we have grown through success to encapsulate Door Entry, Access Control, Communal TV, Security Doors, Door Automation, and CCTV ensuring over 6000 properties are kept safe, secure and with essential communications.

The contract has a dedicated service manager who ensures that all the disciplines are co-ordinate to ensure a one stop shop for the client, who can be assured that “One Call” is all that is required.